Heavy Civil & Infrastructure Cost Data

Highway Construction

Bridge Construction

Tunnel Projects

Transit Projects

Waterpower & Dams

Airport Projects

Sewer & Water

Transmission Lines

Mainline Pipeline

 


Hewitt Estimating Consultants are pleased to provide our cost data fully based on over 40 years of experience bidding on major heavy civil & infrastructure projects around the world. The cost data is available in Chief Estimator format as well a several other of the best estimating software on the market.

 

For more information click on the arrow below to view our introductory movie or click on any of the estimate data packages to read a description of what is included, view screen captures or view a short video demo of each master estimate. 

View Video

Resource & Reference Estimate Assemblies

The following Resource and Reference Estimate Data is included;

  • Site Preparation
  • Earth Excavation & Backfill
  • Rock Excavation
  • Earth & Dam Embankments
  • Roller Compacted Concrete
  • TBM Tunnel Excavation
  • Mined SEM Excavation
  • Drill Blast Tunnels
  • Sewer & Watermains
  • Piles & Caissons
  • Shoring of Excavation (SOE)
  • Cast in Place Concrete
  • Precast Concrete Fabrication
  • Highway Overpasses
  • Elevated Transit Guideways
  • Cable Stay River Bridges
  • Temporary Bridge Structures
  • Retaining Walls
  • Structural Steel Erection
  • Batch Concrete Onsite
  • Aggregate Base & Paving
  • Process Aggregates
  • Light Rail Track Work
  • Transmission Towers
  • Line Stringing
  • String Lay Mainline Pipeline
  •  Contractor Indirect Costs
  • Supply Operate Camp

 Click here to download a summary or our Heavy Civil & Infrastructure Cost Data.

International Construction Cost Data

The cost data packages are available in United States and Canadian dollars in both imperial (english) and metric units of measure.

On request we can create cost data in other international currencies. Based on our international estimating experience, we can convert our labour and material rates utilizing exchange rates and cost indexes. Our equipment rates will be updated based on local fuel costs and mechanic rates. Our crew sizes, production rates and man-hour factors will be adjusted based on our experience bidding in similar parts of the world.

 

World Map